PROJECT 2: DOCUMENTATION OF A MEDIUM-SIZED PROJECT
OUR TASK IS TO DOCUMENT OUR OWN DESIGN STUDIO PROJECT FROM THE POINT OF VIEW OF A PROJECT MANAGER. DOCUMENT (WRITTEN REPORT, ANNOTATED VISUAL IMAGES) WILL BE IN 5 MAIN COMPONENTS IN TOTAL:
1. INTRODUCTION OF PROJECT (IDENTIFYING CLIENTS, STAKEHOLDERS, OBJECTIVES AND GOALS).
2. DESIGN ANALYSIS, PICKING UP ISSUES OF DESIGN SUITABILITY AND PROJECT VIABILITY AND SPECIFICALLY RELATED TO OUR DESIGN. (NOTE: THIS IS TO BE IN ESSAY FORMAT, SCHEMATIC DIAGRAMS, SKETCHES AND DRAWING WHERE NECESSARY).
3. PROJECT PROCUREMENT AND RESOURCE PLANNING (TO IDENTIFY THE MOST SUITABLE CONTRACT PROCUREMENT FOR THE PROJECT AND PLANNING OF RESOURCES, ORGANIZATION STRUCTURES TO ACHIEVE PROJECT DELIVERABLES)
4. RISK ANALYSIS, AND MAINTENANCE STRATEGY ( TO ACHIEVE THE IDENTIFIED SUCCESS CRITERIA AND PROJECT DELIVERABLES) THIS MUST BE IN A TABLE FORMAT.
5. SUCCESS CRITERIA, WBS , GANTT CHART (SHOWING THE MEASURABLE SUCCESS CRITERIA FOR THE OVERALL IMPLEMENTATION STRATEGY, ANALYSIS OF CRITICAL PATHS, FLOATS PLOTTED AGAINST TIME). THIS CHART WILL HIGHLIGHT PROJECT DELIVERABLES.
6. STUDENTS ARE REQUIRED TO PERFORM THEIR OWN RESEARCH AND STUDY ON THE MENTIONED COMPONENTS