PROJECT 1: AUDITORIUM ( A CASE STUDY ON ACOUSTIC DESIGN)
IN A GROUP OF 8, WE WERE REQUIRED TO CONDUCT A CASE STUDY ON AUDITORIUM LOCALLY. IT IS GOING TO BE AN OBSERVE AND REPORT CASE STUDY. EACH GROUP NEED TO GET PERMISSION FROM THE RESPONSIBLE PERSONNEL OF THE BUILDING.
​
LIST OF THE TASK:
1. DRAWINGS OF THE AUDITORIUM (FLOOR LAYOUT, SIGNIFICANT SECTIONS)
2. HISTORICAL BACKGROUND
3. SOUND ABSORPTION MATERIALS USED
4. SOUND SOURCE (IN AUDITORIUM - CAN BE SHOWN IN DRAWINGS)
5. SOUND PATH (IN AUDITORIUM - CAN BE SHOWN IN DRAWINGS)
6. COMPILE INFORMATION INTO A REPORT
​
PROJECT 2: INTEGRATION PROJECT
FOR THIS ASSIGNMENT, EACH STUDENT WAS REQUIRED TO IDENTIFY TWO SIGNIFICANT SPACES IN OUR FINAL DESIGN FOR IMPLEMENTING THE ARTIFICIAL AND THE DAY LIGHTING STRATEGIES (PSALI).
​
WE WERE TO PRODUCE TO FOLLOWINGS THROUGHOUT THIS PROJECT:
1. A BRIEF SITE ANALYSIS
2. OVERALL FLOOR PLAN
3. FLOOR PLANS OF 'SPACE A' AND 'SPACE B'
4. SECTIONS OF 'SPACE A' AND 'SPACE B'
5. REFLECTED CEILING PLANS
6. LIGHTING CONTOURS
7. TYPES OF LAMPS TO BE USED
8. TO DETERMINE REFLECTANCE ON WALLS, CEILINGS, FLOORS
9. DAYLIGHTING CALCULATION
10. LUMEN METHOD CALCULATION
11. LIGHTING DESIGN PROPOSAL
​
​
THIS ASSIGNMENT SHOWED US THE UNDERSTANDING OF ARTIFICIAL LIGHTING AND DAYLIGHTING STRATEGIES (PSALI) IN OUR FINAL DESIGN AND HELPED ME TO SOLVE DESIGN PROBLEMS IN RELATION TO SUSTAINABILITY ISSUES.